Quality, ummm what's that? Part 3
I'm beginning to think were being sent some type of message from the gods.
Truck was due in at 3pm Wednesday, we got it pushed back to 5pm.
The salary people are on the line again (along with the President, who I had to show how to do what he ended up doing, yea for me). We are working our butts off trying to get everything done by 5pm. We are working on the last 2 totes and the truck shows up. We talk with him and he says he can give us 45 minutes then he has to leave.
So we are back at it, pushing to get those 2 totes done. We finish one tote and start working on the last tote and what happens?
Yep the machine that does our heat welding catches on fire, a very small fire, but a fire non the less. Didn't get that last tote finished.
In all we only short shipped one tote, yea for us.
Bad news, the machine is being repaired and we have another huge shipment going out Friday.
Oy Vey.